Tuesday, June 4, 2019
Building Information Model in Energy Performance
 edifice  schooling Model in Energy  actionCHAPTER 3 RESEARCH METHODOLOGYCHAPTER 3 RESEARCH METHODOLOGYIntroductionBuilding Information Model  locoweed be applied in  unlike stages from feasibility  take aim to demolition stage. The application of BIM in energy  surgery and  smell  make pass cost assessment  ar presented in this research. According to Grilo and Jardim-Goncalves (2010), Building Information Modelling  git be applied to the design of energy performance of a building and to evaluate the difference between various  turn materials of the envelope. BIM becomes possible to assess the performance of the life cycle cost of the building in the early design stages.To study the benefits and  ambiguous of the integration of the BIM and Life  cycles/second Cost Assessment, the energy- salve performance of the curtain  smother system was focused to  convey assessment in annual energy consumption , by using BIM softw ars.  by the assessment of energy consumption, the Life Cycle Cost    of HVAC system and lighting system of the  commercial-grade building can be evaluated.Research FrameworkTo  run across the aims of the research, an all-round research on the integration of BIM and life cycle cost assessment containing  books review, pilot study with its results, discussion, conclusions and recommendation. The research framework is illustrated as  view 3.2.1.Literature ReviewThe purpose of the literature review is to study about the BIM application in the construction industry in recent years. Besides, reading  separate literatures before pilot study can comprehend the knowledge about the definition of BIM, formulas of life cycle cost and the process to assess the energy saving performance of curtain wall via the BIM environment. Besides, the definition, merits and elements of life cycle cost have been studied in the review. Some relevant books, journals and papers are the major sources of literature review in this paper.Data Collection and Practicability of Pilot S   tudyIn this stage, a commercial building with curtain wall system is selected to have pilot study in this paper. Architectural 2D drawings of the building and some detail information about the building should also be collected at this stage. Furthermore, various data about curtain wall should be amassed, such as the shading coefficient and the lighting transmittance of certain curtain wall systems of the commercial building. After the preparatory study of the data and drawings, the practicability of conducting the pilot study can be assessed. The examination of BIM softwares which can be adopted in this study should also be conducted at this stage.Development of Building ModelWith the collected 2D drawings of the commercial building, the floor plans of the buildings are converted to a 3D  mannikin drawing by entering those dimensions to eQUEST. After that other information about curtain wall system, such as the type and specification of curtain wall system, should be inputted to the    software.Conducting Pilot StudyBackground of the Pilot StudyIn Hong Kong, around 66% of electricity consumption was used by the commercial sector. In order to investigate the energy saving measure of the commercial sector, a commercial building with a curtain wall system which is one of the  menstruum methods to save electricity is the targeted building in this study. The design and layout out of the building assessed is similar to the commercial building nowadays. Besides, ten types of curtain wall are selected to be assessed with the target building and the cost data of those curtain wall systems are collected from consultant firms and contractors. In this pilot study, there are three sustainable performance assessments. With the integration of BIM and the pilot study, the annual energy consumption of the commercial building can be assessed with the use of BIM. After the assessment of performance, the life cycle cost which is used to assess the cost of an asset over a specified p   eriod of time can be calculated.Table 3.6.1 Background Information about Pilot StudyAssessmenteQUEST is used to assess the energy performance of the targeted building. Three assessments are included in energy assessment and they are i) relationship between U-value and energy consumption of HVAC system, ii) relationship between shading coefficient and HVAC system and iii) visible transmittance and lighting system. After the energy performance assessment, an  sparing performance assessment would be conducted. The value of energy consumption obtained by eQUEST in chapter 6 will also be used to calculate the life cycle cost of the building with the use of Microsoft Excel 2013. About the detail processes of calculating life cycle cost, they will be discussed in Chapter 7.Softwares Adopted in Pilot StudyeQUESTeQUEST is a 6D BIM softwares that provides whole building energy performance assessment. It is widely used and popular in United States and Canada because of its high  the true. With    its wizards and dynamic defaults, eQUEST can rapidly conduct whole-building performance simulation analysis and generate various energy consumption reports, such as Annual Energy Consumption by Enduse report. Besides, eQUEST is able to assess the performance of building throughout the entire design process, from the conceptual stage to the final stage of design. About the simulation engine of eQUEST,  free energy 2.2 is also popular within various BIM softwares because of its widely used. Last but not least, eQUEST has been tested according to ASHRAE Standard 140 which is a well-known external standard.Microsoft Excel 2013Microsoft Excel is a spreadsheet software developed by Microsoft. It has been widely used in different industry because of its fantastic application in  numeration and graphing tools. Apart from the special features of forming two-dimensional and a very limited three-dimensional graph, Microsoft Excel still has the basic features of spreadsheet, such as using the    numbered rows and the numbered columns to define the  mend of the cells.Declaration for Software AdoptionIt is declared that this paper has no relationship or connection with the developer of software mentioned above, namely, eQUEST and Microsoft. Those softwares have been used because of three reasons. First of all, they are capable to perform the assessment, such as energy consumption assessment, required in this study. Secondly, they are well-known softwares in the construction industry for assessing building performance in energy usage and life cycle cost calculation. Finally, those softwares have developed education or free visions in which students or the public can download from its official website.DiscussionAfter the sustainable performance assessment via BIM environment, the discussion about the integration of BIM and sustainable assessment will be conducted. The benefits and ambiguous encountered by 6D BIM can be identified in the process of assessment, especially for eQU   EST. Furthermore, the results of curtain wall systems in energy and economic aspect will be consolidated and form an overall performance assessment. The most economic, environmental and optimum types of curtain wall system can be selected by different graphs. finding and RecommendationAfter the stage mentioned above, the findings about the features of the curtain wall system and energy consumption can be consolidated at this stage. Also, limitations that restrict the accuracy of the study would be pointed out in chapter 9. Besides, some recommendations for further study about the improvement of the integration between BIM and sustainable assessment of the building would be made.  
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.